Why quote tracking needs a workflow, not just a spreadsheet
In a trading company, a quote is rarely a one-off document. It moves between sales, operations, finance and sometimes suppliers. Each handover introduces a risk: a missed follow-up, an unclear owner, or a version that nobody can trace. Lark Base is presented as a way to organise structured work data, owners, dates and status views. It is not a native quotation product, but it can be configured to support a quote-tracking workflow. This guide sets out a practical sequence for Hong Kong and APAC teams: discovery, design, pilot and sign-off. The aim is to make the handover between people and the system explicit, define access control, and agree exit conditions before go-live.
Step 1: Discovery – map the current quote process

Before building anything, document how quotes are handled today. The goal is to identify where data is created, who owns it, and where handovers occur. Use a simple table to capture the current state.
| Stage | Who is involved | What is recorded | Handover point |
|---|---|---|---|
| Enquiry received | Sales | Client name, product, quantity, target price | Sales to sales support |
| Quote preparation | Sales support | Cost, margin, validity date | Sales support to line manager |
| Internal sign-off | Line manager, finance | Approval decision, date | Approver to sales |
| Quote sent to client | Sales | Date sent, version | Sales to client |
| Follow-up | Sales | Client response, next action | Sales to line manager |
At this stage, do not design the Base. Instead, agree on the data owner for each stage. The data owner is the person accountable for the accuracy and completeness of the record at that point. Also note any existing client file or decision record that must be referenced. This discovery output becomes the basis for the Base design.
Step 2: Design – build the Base structure and access control
Lark Base provides multiple views and filtering/grouping, and data edits are shared across views. That means a change made in one view is visible in others, so the design must be deliberate. Start with a single table for quotes, then add views for different teams.
Core fields to include
- Quote ID – a unique reference for each quote.
- Client name – the trading counterparty.
- Product or service – what is being quoted.
- Owner – the person responsible for the next action.
- Status – for example: draft, pending sign-off, sent, follow-up due, closed.
- Quote date – when the quote was issued.
- Validity date – when the quote expires.
- Next follow-up date – when the owner should next contact the client.
- Decision record – a short note on any approval or rejection, with date and approver.
Views to create
- My quotes – filtered to the current user as owner.
- Pending sign-off – grouped by approver.
- Follow-up due – filtered to next follow-up date on or before today.
- All quotes – grouped by status for line managers.
Access control should be agreed before the pilot. Decide who can edit, who can view, and who can change status. In Lark Base, permissions can be set at the table or view level. Document these decisions in a simple access control matrix.
| Role | Can view | Can edit | Can change status |
|---|---|---|---|
| Sales | Own quotes and team quotes | Own quotes | Yes, up to 'sent' |
| Sales support | All quotes | All quotes | No |
| Line manager | All quotes | All quotes | Yes, including sign-off |
| Finance | All quotes | No | No |
Also define the handover rules. For example, when a quote moves from 'draft' to 'pending sign-off', the owner changes from sales support to the line manager. The Base should reflect this in the owner field, and the line manager should receive a notification or check the 'Pending sign-off' view daily.
Step 3: Pilot – test with a small group and define exit conditions
Run a pilot with one sales team and one line manager for a defined period, such as two weeks. The pilot should test the workflow, not just the software. Before starting, agree on exit conditions – the criteria that will determine whether to proceed, adjust or stop.
Pilot checklist
- Select a pilot group and nominate a pilot lead.
- Brief the group on the new workflow, including handover points and access control.
- Set a start and end date for the pilot.
- Define exit conditions, for example: all pilot quotes are logged in Base; follow-up dates are set for every sent quote; sign-off is recorded in the decision record field; no quotes are tracked outside Base during the pilot.
- Hold a mid-pilot check to gather feedback.
- At the end, review against exit conditions and decide next steps.
During the pilot, pay attention to the handover between people and the system. For example, when a salesperson sends a quote, do they update the status and set the next follow-up date? When a line manager approves, do they record the decision and change the owner? These are the moments where the workflow can break down. The pilot lead should observe and note any gaps.
Step 4: Sign-off and go-live – formalise the workflow
After a successful pilot, prepare for go-live. This is not just a technical switch; it is a change in working practice. Hold a sign-off meeting with the pilot group, line managers and any data owners. Review the pilot results against the exit conditions and agree any adjustments to the Base design or access control.
Go-live checklist
- Confirm the final Base structure and views.
- Update the access control matrix and share it with all users.
- Document the handover rules in a one-page guide.
- Schedule training or a walkthrough for all users.
- Agree a review date, for example four weeks after go-live, to check adoption and data quality.
- Define what happens to quotes that are in progress on the go-live date – for example, migrate open quotes into Base and close old spreadsheets.
At go-live, the audit trail becomes important. Lark Base records edits, but the workflow should also include a decision record field for approvals. This gives line managers a clear view of who approved what and when. For trading companies, where quotes may be revisited or disputed, this record is valuable.
Balanced limitations and governance checklist
Lark Base is a flexible tool, but it is not a dedicated quotation system. It does not enforce a quote workflow out of the box; the discipline comes from the team. Also, while Lark Base supports access control, compliance with any specific regulation is a matter for your own governance. Use the checklist below to manage these limitations.
Governance checklist
- Assign a data owner for the Base and for each stage of the quote process.
- Document access control decisions and review them quarterly.
- Agree handover rules and include them in onboarding.
- Use the decision record field for all sign-offs.
- Set exit conditions for any pilot and review them formally.
- Keep a client file or reference for each quote, linked by Quote ID.
- Define a retention period for closed quotes and archive accordingly.
- Review the workflow after go-live and adjust as needed.
For teams considering Lark Base, the pricing and contact pages on larksuite.com.hk provide further information. The key is to treat the rollout as a workflow project, not just a software installation.
Frequently asked questions
Can Lark Base automatically send follow-up reminders?
Lark Base allows you to create views filtered by follow-up date, but automatic notifications depend on how you configure the Base and any connected workflows. The evidence does not claim native automated reminders for quote tracking. Teams should agree a manual check routine, such as reviewing the 'Follow-up due' view each morning.
How do we handle quotes that need multiple approvers?
You can design the Base to include a sign-off status and a decision record field. For multiple approvers, consider adding a separate table for approvals linked to the quote, or use a status field that reflects the approval stage. The workflow should specify the order of approvers and who updates the status.
What should we do if the pilot fails to meet exit conditions?
If the pilot does not meet the agreed exit conditions, do not proceed to go-live. Instead, review the gaps with the pilot group. Adjust the Base design, access control or handover rules, and run a second pilot. The exit conditions are there to protect the team from a premature rollout.
Sources and evidence boundary
These first-party pages support only the specific product or legal context stated here. Verify current capability, plan and compliance responsibility before acting.
Next step: test one workflow
Map one high-frequency workflow, then evaluate Lark against ownership, data, access and acceptance criteria. Contact us.


